Flood Prevention Measures - Eglington, Northern Ireland

Flood Prevention Measures - Eglington, Northern Ireland

The Project

Telefonica’s telecoms site at Longfield was identified as at risk of flooding. Clarke were tasked to devise a solution which would prevent the risk of flooding.

After assessing the right level to avoid future flooding, our solution included raising the site off the ground. We designed, fabricated, and installed a new steelwork platform on which to house the existing site equipment.

Project Information

Longfield, Eglington, Northern Ireland

Location: Longfield, Eglington, Northern Ireland
Project Duration: 3 Weeks

Services Rendered

  • Design
  • Civil Construction
Flood Prevention Measures - Eglington, Northern Ireland

The Scope of Works

  • Solution included removing all site equipment
  • Designing and fabricating a raised platform at a height above the water levels seen previously
  • Installation of the raised platform
  • All existing site equipment positioned on the newly-fabricated, raised steel platform

"Working to the client’s tight timescale, we designed and built a solution to eradicate the risk of site flooding while minimising the operator’s downtime"